Lvov CHPP

Design, production, supply, assembly and set up of power equipment at Lvov CHPP:

  • assembly of piping of 12 MWt turbine generator (2003);
  • manufacturing of a steam boiler # 9 with steam production capacity 70 t/h (2004);
  • repair of PTVM-100 boiler # 2 with chimney replacement (2004).