Deployed projects

Geography of domestic projects of “Kotloenergoproject” – 19 regions of Ukraine.

International affairs of the company include projects deployed in RussiaLatviaGuinea and Yemen.

Zaporozhye Oil and Fat Plant

Development of the project to reconstruct the boiler house of PrJSC “Zaporozhye Oil and Fat Plant” with installation of two husk burning biomass boilers and a turbine generator with a capacity of 3.5 MWt. (2013-2014)…
more arrow_forward_ios

JSC “Liepayas Metallurgs”

Development of the technical project and detailed drawings of a unit, which ensures natural circulation in the evaporative cooling device under conditions of efficient insulation of skid pipes of rolling mill “350/250” at JSC “Liepayas…
more arrow_forward_ios

Public Corporation “Krasnodonugol”

Conversion of КЕ-1-14-С boiler to burn methane-air mixture (MAM) in a boiler house of JV «Mine Administration «Samsonovskaya-Zapadnaya» of Public Corporation “Krasnodonugol” (2010). Reconstruction of the boiler house substituting the steam boiler DKVR-6,5/13 for a…
more arrow_forward_ios

“Nikolayev Alumina Plant” LLC

Reconstruction of TPP of Nikolayev Alumina Plant with installation of three industrial steam boilers (manufactured by “Kotloenergoproject”) at 90 t/hour of steam, Nikolayev (2008). Building of 3 steam boilers for TPP of Nikolayev Alumina Plant…
more arrow_forward_ios